Seven ways to fast-track capital’s cycle scheme delivery

Rik Andrew London SE6
13 April 2018
Improving the cyclist’s lot: cut the modelling and reduce the consultation, says Rik Andrew
Improving the cyclist’s lot: cut the modelling and reduce the consultation, says Rik Andrew

 

The overall and major problem with the London Assembly transport committee’s report on cycling is that it is right to say Transport for London processes are much too slow but the committee has not suggested how to speed up delivery (‘Cycle superhighways brand is ‘past sell-by date’ – Assembly’ LTT 30 Mar).

There are several unnecessary causes of delay:

1. TfL may only own 5 per cent of London’s roads but it manages 100 per cent of the capital’s signals and it thus can and does block many London borough schemes to assist cycling. Devolving responsibility for signals to boroughs would really free things up.

2. The Dutch do not do modelling – why do we? It wastes six months and costs £90,000 per project (approximately). The models are loaded in favour of motorised traffic, subject to much manual manipulation, and produce unreliable forecasts that are then presented as fact. 

3. ‘Safety Audits’ are another outdated TfL time-waster that add no value whatsoever. Cycle schemes are all about safety anyway.

4. TfL is a bottleneck and only progresses one or two cycle schemes at a time. Devolving design to cross-borough project teams would enable more cycle routes to progress in parallel, with design being done by people who have the local knowledge that TfL lacks. It’s not as if TfL has superior cycling expertise.

5. Scheme designers should first ask local cyclists what they want and then see if there is any real reason why it can’t be done. That would be better than the current practice of wasting a year designing something behind closed doors and then trying to defend an unsafe third-rate design. 

6. TfL’s public consultation exercises are a farce and a huge time-waster. TfL goes out of its way to consult every possible objector despite knowing that 78 per cent of people want more (good) cycle infrastructure even where that means less space for drivers (source: Sustrans 2017 Bike Life survey results).

7. Strategic cycle routes typically pass through about four boroughs, so no single borough should have a veto on a route. In reality, a borough’s opposition to a scheme usually means a single senior officer or councillor is cycle-hostile. 

Boris Johnson’s cycling commissioner Andrew Gilligan failed to change any of these common delay factors.

Team Leader Transport
Slough Borough Council
Slough – Observatory House
£44,428 to £49,498 plus £7,000 market supplement; Local Weighting Allowance of £1039 per annum
Team Leader Transport
Slough Borough Council
Slough – Observatory House
£44,428 to £49,498 plus £7,000 market supplement; Local Weighting Allowance of £1039 per annum
Works Supervisor
Transport for London
Croydon, London Trams Depot
£36,000 - £39,638
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020