 
				
				
			
			Tolls could be implemented on the Hammersmith Bridge in west London when it re-opens after repairs, the London Borough of Hammersmith and Fulham has said.
The bridge was closed in April after microfractures were discovered in the cast iron pedestals securing the bridge.
The repair work is expected to take three years to complete and the latest cost estimate for the works is £120m. TfL has provided £25m for design and early works and is working with the borough on a...
+78% more
Includes full online access to TransportXtra.com and searchable archive
Essential reading for public and private sector transport professionals in the UK and beyond
Stay ahead of the competition – hear it first
Written by leading experts in the transport industry
Additional publications throughout the year covering specific subjects Active Travel Directory, Loveable Neighbourhoods and Data and Modelling
Access to our webinar library
Full access to the 50,000 article archive
Tailored E-bulletins
 
							TransportXtra is part of Landor LINKS
© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires 
				[Frequently Asked Questions] 
				Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
				Shop & Accounts Enquires
				Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
				
				Advertising Sales & Recruitment Enquires
				Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
				
				Events & Conference Enquires
				Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
				
				Press Releases & Editorial Enquires
				Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
				
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020