Greater manchester PTE is to install 200 new touch-screen ticket machines on the Metrolink network over the next three years as part of a £5.4m project.
121 of the machines will be installed at the existing Metrolink stops, replacing all of the ticket machines on the network. Another 108 will be installed on the new lines to Oldham and Rochdale, Droylsden in Tameside, Chorlton in South Manchester and MediaCityUK in Salford Quays. Up to five machines will be installed at each stop, with at...
+75% more
TransportXtra is part of Landor LINKS
© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020