Allye installs Battery Energy Storage System at Roadchef

Mark Moran
15 October 2024
An Allye BESS at Roadchef Killington Lake

 

Allye Energy has installed a MAX Battery Energy Storage System (BESS) at the Roadchef Killington Lake motorway services in the Lake District.

The BESS was installed and commissioned ahead of the August bank holiday weekend, which was one of the busiest for road traffic in nearly a decade.

Roadchef made the move as demand for power from the grid could reach or exceed the maximum import capacity (MIC) set by the Distribution Network Operator (DNO). At its Killington Lake site, there are a large...

+81% more

 

Head of Digital Connectivity
Cambridgeshire County Council
Alconbury, Cambridgeshire
P6: £77,915 - £84,003
Road Safety Officer/Engineer x2
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
BG10: £34,314 - £37,938
Head of Digital Connectivity
Cambridgeshire County Council
Alconbury, Cambridgeshire
P6: £77,915 - £84,003
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020