Edinburgh Newhaven tram extension opens

21 June 2023
 

The Edinburgh tram network has now been extended to Newhaven from Picardy Place in the city centre.

Work began on the £207m extension in November 2019.

The new 4.6km extension to Newhaven has added eight stops to the existing line and is a continuation of the existing Edinburgh Tramway Network from Edinburgh Airport to York Place.

When originally proposed in 2003, the 14km Edinburgh tram line was predicted to cost £375M, but after significant delays the cost hit £776M when the...

+23% more

 

Development Engineer
London Borough of Bexley
Bexley
£34,476 - £39,777 per annum
Electric Vehicle Programme Manager
London Borough of Hounslow
Hounslow
£49,083 -£52,116 per annum
Development Engineer
London Borough of Bexley
Bexley
£34,476 - £39,777 per annum
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020