Fewer and slower trains to cut HS2 costs?

HIGH SPEED RAIL

18 January 2019
 

The number of trains using the proposed HS2 high-speed rail network could be cut and their speed reduced, in order to deliver the project within budget. 

The options appear in a letter from Andrea Leadsom, the leader of the Commons and Conservative MP for South Northamptonshire, to HS2 Ltd chief executive Mark Thurston. The letter was sent following a presentation Thurston gave to the All-Party Parliamentary Rail Group in November. 

Although Leadsom did not attend, she said her...

+79% more

 

Automatic Traffic Counting Engineer
Department for Transport
Birmingham, Leeds, London
National minimum £40,808, London minimum £44,811
Principal Transport Planning Officer
Slough Borough Council
Observatory House, 25 Windsor Road, Slough
£38,223 to £43,421 Plus £1039 Local Weighting Allowance
Principal Transport Planning Officer
Slough Borough Council
Observatory House, 25 Windsor Road, Slough
£38,223 to £43,421 Plus £1039 Local Weighting Allowance
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020