Docklands Light Railway plan gets £300m from UK Infrastructure Bank

Deniz Huseyin
25 January 2024
A fleet of 54 new DLR trains are due to be in operation by 2026, which includes 11 additional trains
A fleet of 54 new DLR trains are due to be in operation by 2026, which includes 11 additional trains
 

Transport for London (TfL) has secured a £300m loan from the UK Infrastructure Bank towards its Docklands Light Railway (DLR) Rolling Stock Replacement Programme, which currently has an overall cost of £900m.

The loan, provided through the Bank’s Local Authority function, will replace the fleet, some of which have been in use since 1991, as well as infrastructure improvements such as an advanced signalling system, power upgrades, new sidings, a maintenance shed at the Beckton...

+84% more

 

Principal Transport Planner
Camden Council
Camden
Starting salary: £50,537
Network Development Planner Opportunities
Cambridgeshire and Peterborough Combined Authority
Huntingdon
£39,152- £42,839
Senior Transport Planner
Camden Council

Starting salary: £46,006
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020