NR awaits DfT’s verdict on deferred CP5 enhancements

RAIL

Rhodri Clark
05 March 2018
Bristol Temple Meads: re-opening of station platforms in limbo
Bristol Temple Meads: re-opening of station platforms in limbo

 

Network Rail expects to hear from the DfT this month about which of many rail enhancements deferred from the existing five-year control period  (CP5) will be delivered in CP6.

NR’s strategic business plan documents released last month (LTT16 Feb) show many CP5 (2014/15-2018/19) schemes still await authorisation or funding. 

The strategic business plan sets out Network Rail’s spending plans for control period 6, covering 2019/20-2023/24. It is based on the DfT’s...

+86% more

 

Traffic/Road Safety Engineer
Slough Borough Council
Observatory House, 25 Windsor Road, Slough
£38,223 to £43,421 Plus £1039 Local Weighting Allowance and £5,973 Market Supplement
Automatic Traffic Counting Engineer
Department for Transport
Birmingham, Leeds, London
National minimum £40,808, London minimum £44,811
Traffic/Road Safety Engineer
Slough Borough Council
Observatory House, 25 Windsor Road, Slough
£38,223 to £43,421 Plus £1039 Local Weighting Allowance and £5,973 Market Supplement
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020