What is right with how our railways are run?

Roger Davies, Kendal LA9
21 July 2017
 

Let’s kick-off with the outrageous fiasco of the Great Western electrification. Costs have soared from around £800m to nearly £3bn and the scheme is being cut back. It is over-engineered and all the trains have to be retrofitted as dual mode with diesel engines, much of the work on these UK-built trains being carried out in Italy. 

As a result, the expensive and technically complex wiring of the Severn Tunnel already undertaken is rendered completely unnecessary. Bristol...

+85% more

 

Traffic/Road Safety Engineer
Slough Borough Council
Observatory House, 25 Windsor Road, Slough
£38,223 to £43,421 Plus £1039 Local Weighting Allowance and £5,973 Market Supplement
Automatic Traffic Counting Engineer
Department for Transport
Birmingham, Leeds, London
National minimum £40,808, London minimum £44,811
Principal Transport Planning Officer
Slough Borough Council
Observatory House, 25 Windsor Road, Slough
£38,223 to £43,421 Plus £1039 Local Weighting Allowance
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020