 
			
			Let’s kick-off with the outrageous fiasco of the Great Western electrification. Costs have soared from around £800m to nearly £3bn and the scheme is being cut back. It is over-engineered and all the trains have to be retrofitted as dual mode with diesel engines, much of the work on these UK-built trains being carried out in Italy.
As a result, the expensive and technically complex wiring of the Severn Tunnel already undertaken is rendered completely unnecessary. Bristol...
+85% more
Includes full online access to TransportXtra.com and searchable archive
Essential reading for public and private sector transport professionals in the UK and beyond
Stay ahead of the competition – hear it first
Written by leading experts in the transport industry
Additional publications throughout the year covering specific subjects Active Travel Directory, Loveable Neighbourhoods and Data and Modelling
Access to our webinar library
Full access to the 50,000 article archive
Tailored E-bulletins
 
							TransportXtra is part of Landor LINKS
© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires 
				[Frequently Asked Questions] 
				Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
				Shop & Accounts Enquires
				Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
				
				Advertising Sales & Recruitment Enquires
				Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
				
				Events & Conference Enquires
				Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
				
				Press Releases & Editorial Enquires
				Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
				
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020