Transport minister Sadiq Khan visited Farringdon station today to see Network Rail’s progress on the £250m scheme which will transform it into one of London's busiest transport hubs.
The minister was shown demolition work at Cardinal Tower, the 42 metre office block that is being taken down to make way for an integrated Crossrail and Thameslink ticket hall.
Khan said: “Farringdon sits at the heart of a major investment in London’s railway network.
"From this...
+80% more
TransportXtra is part of Landor LINKS
© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020